Skip to main content

CE & ISO Certified Manufacturer

Custom Steel StructuresLead Time 15–30 Days (by project size)Factory Direct — Free Quote in 24h

5,000T/Month Capacity · CE & ISO Certified · 30+ Countries Served

CE
ISO 9001
SGS

12+ quotes requested this month

Laotie Steel Structure Factory Tour Video
Factory Tour — 5 Production Lines in Action

Current production lead time: 15–30 days depending on project size. Book your production slot now to avoid delays.

Trusted Worldwide — Certified Quality

ISO 9001Quality Management
CEEN 1090 Certified
TÜVCertified
MTCMill test certificates

Free steel warehouse calculator

Enter span, length, and height to get steel tonnage and an FOB China price in USD. No registration required.

Get an instant FOB estimate →

Our Facility

State-of-the-Art Manufacturing Plant

Laotie Steel Structure modern manufacturing facility
Shangqiu Factory
Location
Shangqiu, Henan, China
Lines
5 Production Lines
Capacity
About 5,000 t/month
Markets
Projects in 30+ countries

Quality Assurance

International Certifications

CE (EN 1090)
TÜV
ISO 9001

Every product undergoes rigorous quality inspection throughout production — from raw material sourcing to final surface treatment. Our certifications ensure your project meets the strictest international standards.

5-Step Quality Control

Production Process

From raw steel to finished structure — every step traced by tonnage, every batch inspected.

01

Material Cutting

CNC plasma & flame cutting to precision dimensions (±1mm tolerance).

02

Assembly

Automatic H-beam assembly — web, flange & stiffeners positioned by CNC.

03

Welding

Submerged arc welding (SAW) by certified welders, 100% UT tested.

04

Straightening

H-beam straightening to ≤1/1000 tolerances via hydraulic correction.

05

Shot Blasting & Painting

SA 2.5 surface treatment, epoxy/zinc-rich primer, finish coat applied.

Why Laotie Steel?

Three reasons global buyers choose us over local suppliers

Factory-Direct FOB Pricing

Quotations are FOB from the Shangqiu factory. There is no trading layer between you and the plant.

Lead Time 15–30 Days (by project size)

5 production lines, about 5,000 t/month. Factory lead time is 15–30 days depending on project size. Sea freight and erection are extra.

CE (EN 1090), TÜV & ISO 9001

Full engineering package included. Compliant with AS/NZS, BS, EN, and GB standards.

5.0 from 3 verified clients

What Our Clients Say

Real feedback from real projects. Every review is from a verified client with a completed building.

“High precision, excellent quality, and fast delivery. Laotie Steel is a manufacturer you can trust.”
Hongxin Sports Goods Co.
Project Manager
20,000 m² Industrial ParkDomestic Project, China
“Working with Laotie Steel was completely worry-free. Fast construction with great quality — our 10,000 m² factory was delivered on schedule with zero delays.”
Laiyixin Home Furnishing Co.
Factory Owner
10,000 m² Factory BuildingDomestic Project, China
“A hassle-free experience with Laotie Steel. Weld quality was noticeably better than our previous supplier. Our 3,000 m² factory was delivered right on time.”
Fengyu Food Processing Plant
Plant Director
3,000 m² Factory BuildingDomestic Project, China

Reviews collected via direct client interviews, July 2026. Company names published with written permission.

Start Your Project

Get a Free Quote

Tell us about your project requirements and we'll respond within 2 hours

Alibaba Store
View & Order Online
Location
Shangqiu, Henan, China